2018 show is booked for 2nd-16th September in StJames Hathcham building, aka the Church.

Peter Mackenzie's avatar
Peter Mackenzie committed
3
## 2018 Exhibition-specific guidelines:
Peter Mackenzie's avatar
Peter Mackenzie committed
4

Peter Mackenzie's avatar
Peter Mackenzie committed
5
6
7
8
9
10
11
12
13
14
15
16
### 1. Exhibtion time line 

1. build-up starting Monday 27th August
2. All works complete and ready for examination 10am on Thursday 6th September
3. exhibition opening thursday 6th September, 6pm - 9pm.
4. pack-down 10-14 September.

### 2. Risk Assessments (including equipment requests) filled in and submitted before Friday the 17th of August
1. Completion of risk assesment is a legal requirment of public exhibition
2. included in the submission is Equipment requests.
3. failure to submit form will effect allocation of equipment provided by dept.
4. No work or installation will be allowed in the show without a completed risk assesment process.
Peter Mackenzie's avatar
Peter Mackenzie committed
17
 
Peter Mackenzie's avatar
Peter Mackenzie committed
18
19
20
21
22
23
24
### 3. Equipment reservation and booking
1. Students can request the equipment they deem appropriate for their needs
2. TechTeam reserves the right for final decision on equipment choice considering the needs of the exhibition group as a whole and availability of equipment
3. Maximum 1 projector or 1 large screen per person
4. Maximum 1 iMac per person
5. Maximum 3 items in total per person

Peter Mackenzie's avatar
Peter Mackenzie committed
25

Peter Mackenzie's avatar
Peter Mackenzie committed
26
### 4. Installtion and setup requiring previous permission from TechTeam
Peter Mackenzie's avatar
Peter Mackenzie committed
27

Peter Mackenzie's avatar
Peter Mackenzie committed
28
29
30
31
32
33
1. Painting of walls or floors
2. errecting, removing or altering structural elements.
3. techincal support is required for any work happening 2m (or greater) above floor level.
4. suspension of any object heavier than 1kg.
5. No teaching equipment or IT services machinery to be be moved. Techincians will remove on request
6. All changes of this nature should be desrcibed in advance in Risk assesement form.
Peter Mackenzie's avatar
Peter Mackenzie committed
34

Peter Mackenzie's avatar
Peter Mackenzie committed
35
### 5. Space Packdown, repairs and restorations.
Peter Mackenzie's avatar
Peter Mackenzie committed
36
 
Peter Mackenzie's avatar
Peter Mackenzie committed
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
 1. All space must be returned to its previous state and condition.
 2. Walls will be left repaired, holes filled and white.
 3. floors will be repainted with provded floor paint, allow two days drying time in all cases.
 4. The Dept will provide a skip, outside SJH/Church , all waste must be removed and thrown out.
 5. Any works people wish to keep must be taken with them.
 6. the Dept can not provided any storage of works.

### 6. Exhibition Equipment & invigilation

 1. Each participant is responsible for their own equipment or equipment they borrowed from the Department
 2. No equipment is to be swapped or exchanged without techTeam confirmation
 3. No equipment, unless secured suitably or invigilated, is to be left over night in the space
 4. If equipment has to be left in spaces a designated invigilator must remain in the space until 10pm
 5. Once Security lock up, equipment is considered safe to leave out over night.
 6. Invigilation has to start with Security unlocking the space in the morning.
 7. The Dept is not responsible for any personal belongings left in public exhbition spaces.